Design stage

The sprinkler answers before the warrant asks.

Send the GA plans and the fire strategy. What comes back is a short review: category and its consequences, the water-supply route and the space it needs, the pod and lining conditions, zoning, the electrical interface, and the certification the warrant will want.

Offer wording and turnaround: to be ruled by Mitra in step 6 (Decision Memo D7 — a date given is kept).

Questions we answer

Does the building need sprinklers?

Scope of the Scottish mandate for new flats and other residential buildings, and what falls outside it. [Answer and clause reference to be written and verified — step 6]

Which BS 9251 category applies?

[To be written — category 1, 2 or 3 by building type and height, with the clause]

How much plant-room space do the tank and pump need?

[To be written — typical allowances by category, with the caveat that the figure comes from the calculation]

Do bathroom pods and ceiling pockets need heads?

[To be written — the omission conditions and the pocket rule, with clause references]

Can the sprinkler tank share the domestic supply?

[To be written — the reserve-volume rule and the conditions under which sharing is compliant]

Send us the plans

GA plans, the fire strategy, the available plant space and a section for heights. Contact →